Part 1: Soil removal.
Part 2: Lay Base of 1.5 inch roadstone.
Part 2: Cover with next layer of .75 inch roadstone.
Part 3: Carefully place large pieces of flagstone on a base of sand to provide an aesthetic look to the trail.